Short answer. Jira's CSV export gives time in seconds. Divide by 3,600 for hours: =C2/3600. For hours and minutes, divide by 86,400 and format the cell as [h]:mm. The export still has one row per work item (issue); for a row per worklog you need Jira's worklog API.
Which columns are in seconds
In Jira, search for work items, then Export → Export Excel CSV (all fields) or (current fields) (Atlassian's steps). These columns hold seconds:
- Time Spent, Original Estimate and Remaining Estimate: for the work item itself.
- Σ Time Spent, Σ Original Estimate and Σ Remaining Estimate: the same, plus its sub-tasks.
Jira shows “1d 2h”, but stores seconds using your site's working day, set by an admin under time tracking. With the default 8-hour day, a worklog of 1d is 28,800 seconds, which is 8 hours, not 24.
/3600Hours8.00/86400 as [h]:mmHours and minutes8:00Seconds to hours in Google Sheets
Import the file with File → Import → Upload. If Time Spent is in column C, add a column next to it:
=ROUND(C2/3600, 2)Or fill the whole column at once from one cell:
=ARRAYFORMULA(IF(C2:C="", "", ROUND(C2:C/3600, 2)))Seconds to hours in Excel
Open the CSV, select the data and press Ctrl+T to make it a table, then type =[@[Time Spent]]/3600 in a new column; the table fills it down. In Power Query, select the column and choose Transform → Standard → Divide by 3600.
Hours and minutes: 7:30, not 7.5
Spreadsheets count time in days, so divide the seconds by 86,400 (the seconds in a day) and format the result as elapsed hours:
=C2/86400- Google Sheets: Format → Number → Custom number format, then
[h]:mm. - Excel: Format Cells → Custom, then
[h]:mm.
The square brackets let totals go past 24 hours: a week of 37.5 hours shows as 37:30 rather than 13:30.
One row per worklog
Each CSV row is a work item, so Time Spent can't tell you who logged the time or on which day. Exports with all fields can include Log Work columns, one per worklog, with the parts separated by semicolons: comment, date, author and seconds. They are awkward to use: comments can contain semicolons, the author is an account id rather than a name, and a busy work item adds dozens of columns.
For a timesheet, get the worklogs themselves from Jira's worklog API. The free timesheet template does it from a menu in Google Sheets, with hours already converted, and the worklog export guide compares the other ways.
Why the totals don't match a timesheet
What the search returns
WEB-114
Fix VAT on invoices
- Time spent
- 31.50 h
Everyone, since the work item was created.
The worklogs inside it
| 12 Sep | Ben Okafor | 6.00 |
| 30 Sep | Ana Ruiz | 2.50 |
| 2 Oct | Ana Ruiz | 1.50 |
| 6 Oct | Chloé Martin | 4.00 |
| 14 Oct | Ana Ruiz | 2.00 |
| 21 Oct | Ben Okafor | 3.50 |
| 9 more worklogs | 12.00 | |
- Ana, October
- 3.50 h
- Time Spent is all-time. A work item open since March carries every hour logged on it since March, by everyone.
- JQL picks work items, not hours.
worklogDate >= 2026-10-01finds items with some time logged in October, then exports their full totals. Since September 2026 it can also leave items out (why). - Σ columns count sub-tasks twice if you also export the sub-tasks as their own rows. Add up Time Spent, or Σ Time Spent on parents only.